Skip to content

Projects

London Dock

London Dock is a 26 floor new build property containing 1 – 4 bedroom apartments in Wapping. Fire Barrier were employed to carry out the cavity fire protection to give a building a two hour protection.
View Details

Harbour Exchange

Engaged as principal contractor, Fire Barrier Services were employed to undertake essential maintenance throughout both buildings at Harbour Exchange, Towers 1 & 2 in the heart of the Docklands, London.
View Details

Hanover Tower

Hanover Tower, Sheffield is a 15-storey block of residential flats owned by Sheffield City Council with the tower being identified as having been refurbished and clad with aluminium composite material (ACM).
View Details

Harrods

With plans for Harrods to completely revamp it’s Beauty Hall offering, Fire Barrier Services was tasked with providing remedial fire stopping works to update the current offering and provide 120 minutes fire protection.
View Details

LNT Care Developments

LNT Care Developments build care homes all over the country, with only three shapes of the building used these projects are fantastic to work on. We have completed 6 care homes so far with another three to be complete by the end of 2020.
View Details

West End Gate, London

West End Gate, London is a 30 floor new build property containing 1 to 4 bedroom apartments on Edgeware Road, just a 10 minute walk drive from Oxford Street. Fire Barrier were employed to carry out the cavity barrier fire protection to give the building a 2 hour protection.
View Details

We are committed to providing total customer satisfaction and building long term relationships.

CALL US TODAY ON: 01332 417167