London Dock

Client:

Martifer

The brief:

London Dock is a 26 floor new build property containing 1 – 4 bedroom apartments in Wapping. 

Fire Barrier were employed to carry out the cavity fire protection to give a building a two hour protection. 

The solution:

Working on a floor at a time we installed ‘Siderise CWFS120 perimeter fire stop system’ complete with Siderise galvanised support brackets which fixed to the concrete floor slab as per product installation guidance. 

This solution provided the client with 2 hour fire resistance between floor compartments and satisfied the building fire strategy.

Once installations were complete a Siderise report of the work was  undertaken and sent to Siderise for their sign off and approval of the installation.